Projects
Colonial Brick & Stone Inc. Shop Renovation (Work in Progress)With Our Tumbled Signature Blend
Left section: The Thin Veneer is being installed onto the base-coat before the mortar has been placed in the joints. Right section: After wall is finished, with mortar in the joints and tooled. 1st 2 steps of Thin Veneer Installation: Read more…